Back filling the timber retaining wall with stone, adding a drainpipe, and cross-bracing the wall. This process gives the wall extra strength, carries water away, and lengthens the useful life of the wall. Steps were added on the left side. This project is highly difficult due to the 72 Inch slope that was measured, however with now over 15+ years of building experience BedRock completed the project with ease and customer satisfaction.