The old brick retaining wall is removed. The new decorative retaining wall is installed along the driveway with steps and a walkway that leads to the front entrance.
Removing the old retaining wall and excavating for the new one.Steps and a walkway are built into the new retaining wall.
Ready to Start Your Project on Solid Ground?
Partner with BedRock Siteworks and experience the confidence that comes with a perfectly prepared site. Let’s build your vision together.